NJ Governor Murphy Marks Beginning Of Testing For NJ Transit Dual-Power Locomotives

Governor Murphy, NJ TRANSIT Chair Diane Gutierrez-Scaccetti, NJ TRANSIT President & CEO Kevin Corbett, and local officials today marked the beginning of testing of the first of 25 new ALP-45 dual-power locomotives manufactured by Alstom during a ceremony that was held on Track A at Newark Penn Station.

The locomotives will meet the current EPA Tier IV requirements, the most rigorous air quality standard to date for new locomotives, reducing emissions compared to the locomotives to be replaced when operating in diesel mode, and producing zero emissions when operating in electric mode. The ALP-45s offer a significant increase in horsepower, acceleration and available head-end power. The ALP-45 locomotives are designed to operate push-pull passenger train service on both electrified and non-electrified lines at speeds of up to 125 mph in electric mode and up to 100 mph in diesel mode.

The locomotives will undergo dynamic qualification and acceptance testing for about six weeks, at which time they will be prepared to enter revenue service.

-via Press Release

 

This article was posted on: April 6, 2021