The Virginia Passenger Rail Authority (VPRA) announced the selection of the Long Bridge Rail Partners – a joint venture comprised of Trumbull Corp., Fay, S&B Construction, and Wagman Heavy Civil, Inc. – as construction partner for the Long Bridge Project-South Package. VPRA separated the Long Bridge Project, a new two-track bridge across the Potomac River, into two procurements, a North Package and a South Package. The North Package was awarded to Skanska/Flatiron Joint Venture in December 2023.
The Long Bridge Project encompasses a 1.8-mile railroad corridor between Arlington, Virginia and Washington, DC. The South Package will use the Design-Build method to build a new two-track railroad bridge across the Potomac River, a bicycle/pedestrian bridge as well as all associated infrastructure between Arlington and Washington, DC. In June, VPRA issued a Request for Qualifications (RFQ) to the qualified design-build teams for the south end of the project.
The selection of the Long Bridge Rail Partners moves the project to the next level as all players are now in place. The Long Bridge Rail Partners team will take the project through the final design phase, incorporating innovative alternative technical concepts, through construction with completion expected in 2030.
The Long Bridge-South Package includes construction from the Rosslyn Interlocking in Arlington, Virginia to the northern abutment of the New Long Bridge on the north side of Ohio Drive SW in East Potomac Park in the District.
The South Package includes:
- Potomac River Bridge – A new two track rail crossing over the George Washington Memorial Parkway and the Potomac River.
- Bicycle/Pedestrian Bridge – A new 16-foot wide bicycle and pedestrian crossing over the George Washington Memorial Parkway and the Potomac River. Dedicated solely to bicycles and pedestrians, this bridge will improve access and provide a safe crossing for those not in cars or on trains. The bridge will have connections at the Long Bridge Aquatic Center, the Mount Vernon Trail, and Ohio Drive SW.
- Additional Infrastructure – New retaining walls and associated embankments will be built at the George Washington Parkway as well as a new fender system within the Potomac River Navigational Channel.
In October, VPRA joined officials including U.S. Secretary of Transportation Pete Buttigieg, U.S. Senators Tim Kaine and Mark Warner, as well as U.S. Representatives Gerry Connelly and Abigail Spanberger, for a groundbreaking ceremony for the $2.3 billion infrastructure improvement project. The new Long Bridge will be strategically placed between the existing Long Bridge and the Washington Metropolitan Area Transit Authority (WMATA) Yellow Line bridge and will relieve one of the worst rail traffic bottlenecks on the East Coast.
-via Press Release